Q235B Steel Heavy Duty Pallet Storage Warehouse Racking
Please have general idea about the pallet rack layout in your warehouse
Techincal Data for Rack System
Style |
Pallet storage warehouse rack
|
Selection |
Single Row, back-to-back Rows and multiple Rows
|
Dimension of Rack |
L2400xD1000xH4050mm, 4 beam levels
Each level 2000KG
Pallet size: L1200x W1100mm |
Beam Range |
120*50mm, 110*45mm
|
Upright Range |
88*68; 80*60mm
|
Colour |
RAL SYSTEM
Upright frame-Blue; Beam-Orange |
Weight Capacity |
Rated 2000KG/Level
|
Package |
Full container: Nude Package; manual handling
Less than container: steel pallets + steel straps + corrugated paper |
Export Area |
South America; Middle America; South(South East) Asia; Africa; Middle East
|
MOQ |
2 units( 1 start unit+1 extension unit)
|
Lead time |
1, 18~21days for one container
2, 25~27days for less than one container |
DETAILED IMAGE FOR PALLET STORAGE WAREHOUSE RACK
Pallet storage warehouse rack project
We deliver capacity safety for our rack system
Please inform us following information to get prompt offer for PALLET RACK
+ The dimensions of single rack unit ( or palletized load descriptions)
+ The palletized payload
+ Row of racks( single row, back-to-back row or multiple rows)
+ How many palletized load within one unit
( Please refer to the Product Description on the top)
FAQ
1, What is MOQ limitation for ?
++ NO. But large purchase will bring competitive prices, 20FT container ( 10T~13T) is highly recommended, so that production can be better handled.
2, What is the lead time in Sunli?
++ As per 20FT container loading, manufacture time is about 21days; Regarding some customized items 25~27days will be covered.
3, What is payments methods Sunli can accept?
++ T/T and L/C are welcomed.
4, How about Sunli's sample delivery?
++ Short section of uprights and beams can be provided free of charge. But the freight will be collected upon your duty.
5, What is warranty for Sunli's rack system?
++ All rack items will be warrantied against manufacture's defects.
++ To avoid any shortage or missing components, we will provide 1%~2% spare parts besides basic ones.