• Heavy Duty Pullout Shelves Racking with Crane Hoist
  • Heavy Duty Pullout Shelves Racking with Crane Hoist

Heavy Duty Pullout Shelves Racking with Crane Hoist

Usage: Tool Rack, Tools, Industrial, Warehouse Rack
Material: Q235B Steel
Structure: Drawer
Type: Multi-Level Racking
Mobility: Adjustable
Height: 2000mm
Customization:
Diamond Member Since 2008

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
SL-MO06
Weight
2000kg/Layer
Closed
Open
Development
New Type
Serviceability
Common Use
Shelf Clear Length
900mm
Load Capacity
2000kg Per Layer
Certifications
Ce/SGS/As4084/ISO9001
Fast Delivery
Within 20 Days
Rack Outer Length
1000mm
Rack Outer Depth
600mm
Item
Pullout Mold Racking
Transport Package
Standard Packing
Specification
H2000* L1000*D600*4 Layers*4cases
Trademark
Sunli
Origin
China
HS Code
7308900000
Production Capacity
20000tons/Year

Product Description

Heavy Duty Pullout Shelves Racking with Crane Hoist

Top Features for mould storage
Pull - Out Shelves, with standard capacity of 2000KG per shelf
One-way pullout shelves
Pull out shelves can easily be rolled out by hand
Available with overhead crane system
Size: L1000 x D600 x H2000mm, 4 levels
        L1000 x D1000 x H2000mm, 4 levels

What Sunli's competitive strength comparing with other suppliers?

1, Innovation and Design: we keep upgrading rack structure yearly
2, Product Ranges: Capable of manufacturing different racks in application
3, Automatic welding: For all conjunction of upright and beams
4, Rigidity of Steel: Our rack system is designed with safety factors 1.65( that will grantee at least 5 years quality)

Technical Descriptions for pullout shelves
 

Style

Mould die storage, rack for mold storage; Pull-out storage rack
 

Selection

Single row,One-way pull out
 

Material

Q235B Steel( powder coated finish)
 

Dimension of rack

Half open and full open style
 

Colour

Blue, Green
 

Weight capacity

2000KG per level, we can do custom-made
 

Package
All items will be package with steel pallet
Corrugated paper outside protection

Services

CAD drawings for rack layout; CAD drawings for installation
 

Lead time

15Days or 27 Days( depends on purchase quantities)
 

Which style of pullout shelves rack would you prefer ?

Heavy Duty Pullout Shelves Racking with Crane Hoist

Heavy Duty Pullout Shelves Racking with Crane Hoist


Please inform us following information to get prompt offer for pullout shelves rack

+  How many levels of shelves per bay?

+  Row of racks(  single row, back-to-back row or multiple rows)

( Please refer to the Product Description on the top)

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2008

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
304
Year of Establishment
2005-03-03